BATHROOM RENO GALLERY

This bathroom had some issues that we addressed for the customer. The window in the shower had leaked and caused rot in the wood structure. The old window was removed as well as all the tile in the shower, then the structure was rebuilt and we put new board and tile in the tub surround. We also installed a new heat lamp in the shower and a timer bathroom fan, as well as installing a new window in the new location above the toilet. The job was finished by doing mud, prime and paint. Timeline was done in under a month.